Sign In | Join Free | My disqueenfrance.com
disqueenfrance.com
Products
Search by Category
Wholesale Marketplace
Home > Air-Compressors >

PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door

Categories Air Shower Tunnel
Brand Name: K-LING
Model Number: KEL-AS2100
Certification: CE
Place of Origin: China
MOQ: 1sets
Supply Ability: 10set/ month
Delivery Time: 15 working days
Packaging Details: polywood packing
Price: USD3000-8000
Material: inside is stainless steel 304 ,outside is steel with power coated
Auto Door: PVC roller door
Conveyor line: auto matic roller conveyor line
Control System: DELTA PLC
Blowing way: 3 side
Control Program: Personal Tailor
Power: 380V/50HZ
Capacity: 1000kgs
Name: PLC Control Air Shower Tunnel
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door

    PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door


    Air shower tunnel for Medical Device Manufacturing Industry:


    Air shower tunnel provides clean and hygienic environments for the manufacturing of medical devices. The air shower system removes harmful particles and contaminants, leading to improved product quality and safety.


    External size : 2110x2380x2400mm

    Internal size : 1460x1650x1900mm

    Material: External is steel with power coated internal is stainless steel 304

    Both side with Auto Roller Door

    air speed: more than 24m/s

    Control system : PLC control system

    Compact product : Auto Conveyor Line


    The follow draw illustration :


    1: Roll door mechanism

    2: Air shower nozzle

    3: HEPA air filter

    4: per-filter

    5: blowing

    6: control box for the roll door

    7: purification light


    Control program: The pallet pass box line can be working in both direction whenever it is. .

    It can put out full pallet and then put only one empty pallet


    From clean room to dirty room:


    A working press the button1, the D1 will be open,

    He left the pallet with finished goods on the conveyor and push the button 1 again for the D1 closed. (the D1 can’t close if the sensor 1 not detected any thing).

    After D1 closed completely, the D2 open, meanwhile the conveyor1 and conveyor2 move the pallet goods out of the pass box until the sensor 2 detected the pallet the conveyor stop working. The door2 closed.

    Note: worker take off the pallets from conveyor 2, then the sensor 2 can’t detect anything, during this time, if someone press the button1 or 2, there is no any respond.


    From dirty room to clean room:


    A worker left the empty pallet on the conveyor, he press the button2, the D2 will be open and the conveyor will be take the empty pallet to the inside of pass box, when the sensor 3 detects the pallet, the conveyor stop move, the D2 closed and the self-clean system blowing 15s with ionized air .15s later the D1 open automatic.

    Note: worker take off the pallets from convyor1, then the sensor1 or3 can’t detect anything, during this time, if someone press the button1 or 2, there is no any respond,

    until the door 1 closed , the new cycle will be start again.


    Note: 1: The PLC control system not including the touchable screen.

    2: the button1 or button 2 can fix at any place that you wanted


    1: Document :

    A: Document for custom clear: 1 sets

    B: Assemble draw : 1 pcs

    C: Circuit diagram draw: 1 pcs

    D: Test report : 1sets

    E: Additional IQ/OQ/PQ document is available upon request.


    2: Extra Free Spare Part so that you can replacement in future by yourself :

    HEPA air filter +Pre-filter : 1 sets for air shower pass box

    Note: HEPA air filter should be replacement in half and one year.

    Pre-filter should be replacement in each 6 months, but it can refresh no more than 3 times

    3: Delivery time: 25 working days after we get the deposit.

    4: Payment term: 30 T/T in advance, 70% before shipment.

    5: The guarantee time is one year excluding consumable parts and Accessories.

    6: The price validity time is 30days.


    PLC Control system for air shower pass box and roller conveyor line :


    Quality PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door for sale
    Send your message to this supplier
     
    *From:
    *To: KeLing Purification Technology Company
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Find Similar Products By Category:
    Inquiry Cart 0

    Friendly Links: www.everychina.com

    Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

    Copyright © 2009 - 2024 disqueenfrance.com. All rights reserved.