| Sign In | Join Free | My disqueenfrance.com |
|
| Categories | Plastic Bottle Mould |
|---|---|
| Brand Name: | Eceng |
| Certification: | CE&SGS&ISO |
| Place of Origin: | China |
| MOQ: | 1set |
| Price: | Negotiable |
| Payment Terms: | L/C, T/T, Western Union |
| Supply Ability: | 10sets per month |
| Delivery Time: | 30 working days |
| Packaging Details: | Film pack |
| Product Material: | Steel |
| Mould life: | 3 to 5 million shots |
| Design software: | UG, PROE, CAD |
| Neck size and volume: | customized |
| Surface treatment: | Mirror Polish |
| warranty: | 1 year |
High Quality Plastic pet preform mold/water bottle preform
molds/plastic bottle mould
Name | Description |
| Mould material | 45#, P20, 718, 2738, S136 etc. |
| Mould base | C45#, LKM, HASCO etc. |
| Cavity | Single / Multi-cavity |
| Runner | Hot / Cold |
| Mould design | 3D / 2D Drawing |
| Design days | 2-3 days |
| Design software | UG,PROE,CAD,CAE,CAM,CAXA ect |
| Plastic material | PET,PP,PE,ABS,PS,PC, etc. |
| Mould life | 3,000,000 shots |
| Packing detail | waterproof film & painted anti-rust oil put in Wooded case |
| Polish system | Mirror polish |
| Payment | T/T, 50% deposit , 50% before shipment |
| Delivery time | 10-15 days |
| Specification | Depends on customers requirements |
Business Step:
| 1. R&D | We support customer R&D. Make the files or improve the design if you needed |
| 2. Quotation | Quotation will according to our customer information |
| 3. Negotiation | The quality, price, material, delivery time. payment item ect. |
| 4. Mould Design | 3-5 days for mould and product 3D/2D drawing design |
| According to customers' request to build the mould. Before make the
mould , |
| When mould are finished, we will test the mould to check it and send the sample for consumers' reference. |
| If the first sample come out is not satisfied with customer needed .we modify the mould and until meet customers satisfactory |
| 8. Delivery | Delivery goods by sea or by air, according to customers requirement |
Mould Maintenance:
♦ Thermal oil: adopting the hydraulic oil for the maintenance to
get in the inlet of cooling water, which can play a lubrication,
rust-proof role.
♦ Maintenance of guiding column: guiding column should be painted a small amount of hydraulic oil, cycle once a month.
♦ It needs to be painted rust preventive if it stops production for long time.
|